Southern Power Generation Intake Cleaning for Main Cooling Water Pump

Client: SOUTHERN POWER GENERATION PASIR GUDANG

Duration: 2 MONTH

SCOPE OF WORKS


  1. Install stop log

  2. Pump water from the water pit

  3. Clean the water pit

  4. Cleaning bend screen

  5. Cleaning bar screen

  6. Cleaning water pit

  7. Remove stop log